Super U Office Project
It’s Super U’s new office project in Guangzhou, scheduled to open in January 2020.
When the client found us, there were only 2 months before the opening date. We realised that there was not enough time to design the shop for the client, the fixed timeframe was one month for production and technical drawings to be made and approved, another month for sea shipping and installation on site.
We immediately sorted all the suitable display fixtures in a brochure and gave it to the customer, what we needed was the selected display fixtures and the layout of the shop. For our designer to create the layout and quote prices once the layout was approved.
It’s an efficient way of saving time.
Technical drawings are provided by us before production, it’s an insurance for the customer to confirm everything is correct without any mistakes.
- Location: China
- Scope: office design, showroom design, office furniture manufacturing
- Tags: office, live streaming
